Language

Modifying the existing air preheater represents the meaningful opportunity to bring additional revenue. To ensure the highest possible efficiency the most advanced design and technology are presented by GEECO.

GEECO undertakes ASSESSMENT studies and Renovation & Modernization jobs exclusively for air preheaters to improve the performance / enhance the life along with site supervision.

Successfully executed a contract to M/s. Koradi TPS through M/s. Alstom Power, India, involving “Design and Engineering for APH Renovation & Modernization” and including supply of all the required items for the R&M Job.

Successfully executed a contract to M/s. Talcher TPS, through M/s. NTPC-Alstom Power, India, involving “Design, Detailed Engineering, Procurement, Manufacturing, Shop Testing, Packing and Delivery” for Air Preheater Sector Angle Modification.

Successfully executed a contract to M/s. Tuticorin TPS, involving “Design and Supply of Complete Support Bearing Assembly including Erection and Commissioning for Air Preheater”.

Successfully executed a contract to M/s. Renusagar Power, for their 05 Boilers, involving “Design, Engineering, Manufacture, Supply and Site Supervision for the Renovation and Modernization of Air Preheater” to improve the Efficiency of Air Preheater.

Successfully executed a contract to M/s. Renukoot Power, involving “Design, Engineering, Manufacture and Supply of Materials for Air Preheater Renovation and Modernization including Site Supervision during Erection and Commissioning of APH”.

Successfully executed a contract to M/s. KEV - Malaysia, involving “Design, Engineering,Manufacturing ,Supply and Erection supervision of Sealing System Modification ”.

Successfully executed a contract to M/s. KEV - Malaysia, involving “Design, Engineering, Manufacturing, Supply and Erection supervision of Improved Air Preheater Drive System”.

Successfully executed a contract to M/s. DMCI Power, Calaca, Philippines, involving “Design, Engineering,Manuafacturing ,Supply and Erection supervision of Complete R&M ”.

Successfully executed a contract to M/s. DMCI Power, Calaca, Philippines, involving “Design, Engineering,Manuafacturing ,Supply and Erection supervision of Complete R&M (PA Angle Conversion (50 to 72 Deg), Improved Sealing System etc.,) ”.

GEECO has established its yet another achievement by making it possible to improve the efficiency of Airpreheaters through R & M. GEECO has successfully carried out this process at Tuticorin Thermal Power station unit #3 in which leakage has been reduced from 15% to 5.65% with reduced total fan loading and fuel consumption thus improving boiler efficiency".

  

GEECO has established its yet another achievement by making it possible to improve the efficiency of Airpreheaters through R & M. GEECO has successfully carried out this process at Tuticorin Thermal Power station unit #4 in which leakage has been reduced from 12.5% to 5.41% with reduced total fan loading and fuel consumption thus improving boiler efficiency”.

GEECO successfully completed the Renovation and Modernisation of APH's at Tuticorin Thermal Power Station, Tamilnadu for Unit # 5 and the Performance Guarantee was met as per the Customer Requirement.

GEECO successfully completed the Renovation and Modernisation of APH's at Mettur Thermal Power Station, (Unit # 1), TANGEDO, Mettur, Tamilnadu and guaranted parameters were achieved.

GEECO successfully supplied, installed and commissioned their First Gas to Gas Heater at Tata Power (Trombay Thermal Power Station). Successfully completed the SUPPORT BEARING ASSEMBLY conversion from Kingsbury type to spherical roller bearing type at Tata Power (Trombay Thermal Power Station – 500 MW).

Supplied Complete Gear Box Assembly for Tata Power Trombay (500 MW) Unit.